Riverfront Park

Overview:  After being significantly damaged in Hurricane Harvey, FEMA is funding the majority of the park restoration project. The City is stabilizing the banks, replacing the benches, adding lighting, and a new boat dock. A sidewalk with railing will run the length of the river so citizens can enjoy the river once again.

Spent So Far: $6,796,895 on construction and engineering

Total Estimated Cost: $19,946,421.46*

*Funding Sources: FEMA 90%, Texas Department of Emergency Management (TDEM) 7.5% City 2.5%

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6

Downtown Plan - Crockett Square / Riverwalk 

Overview: A proposed downtown waterway will connect existing buildings and attractions with proposed new features to make one continuous attraction from the waterfront to the Lake District. The 4-block canal would feature 3500 feet of promenade from Neches to Main with green spaces and landscaping to enhance the area’s natural beauty and murals and public art to add colorful visual elements. Historic architecture would be preserved and renovated to maintain and enhance the city’s rich cultural heritage, and more than ½ a mile of shaded, walkable space will be developed into an exciting, mixed-use development. Depths will vary from 20-40 feet and create a multi-level activity space for dining, boating, and other leisure activities.

Spent So Far: $134,650 for Feasibility Study

Total Estimated Cost: $113,998,600 

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18
  19. 19
  20. 20
  21. 21
  22. 22
  23. 23
  24. 24
  25. 25

Hotel/Conference Center

Overview:  A high-end hotel downtown with ample space for meetings, events and parking would attract businesses, conventions, and groups to the area. With a focus on location, convenience and flexibility, the downtown setting would provide the perfect backdrop for business while being steps from entertainment.

Spent So Far: $118,719 for Feasibility Study

Total Estimated Cost: tbd 

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6

555 Main

Overview: The location of 555 Main will likely be the site of the hotel, among other features to be determined at a later date. Under consideration are an amphitheatre, food truck park, residences, parking, restaurants/retail space, green space, and more. Share your feedback with what you want to see downtown!

Spent So Far: $3,990,217 for building purchase, demolition, sitework, asbestos monitoring, survey, and abatement, and Entergy related costs

Total Estimated Cost: tbd